Calgary’s 12 Ave bicycle track causing nearly 1/4 million extra driving hours per year for commuters

hipbike

The numbers are starting to come in from Calgary’s controversial and expensive bicycle track experiment and they aren’t pretty. Proponents highballed numbers claiming as many as 12,000 cycle commuters per day when pushing for the tracks. They then moved the goalposts to the more realistic couple thousand per day for a baseline when the tracks went in. Despite those number crunching efforts and an extremely mild winter, the cyclist numbers simply are not that impressive. The tiny but vocal cycle lobby has been sadly trying to cherry pick numbers such as a nearly insignificant uptick in female ridership in hopes of claiming success but it is falling on deaf ears for commuters tired of languishing in traffic only to see empty cycle lanes taking up parking and laneways.

Naheed Nenshi said in a radio interview that on 12th Avenue alone the cycle track has added a 2 to 2.5 minutes for drivers to get a short 14 blocks.

While those numbers sound small at a glance, one really needs to look at the cumulative impact of these tracks and in that context they are staggering and bad.

When crunching the numbers and being generous on 12th Ave alone, we see the addition of nearly a quarter million driving hours per year in the city due to the tracks!


12th Avenue SW in Calgary moves between 15,000 and 21,000 cars on an average weekday. It is a very busy avenue on weekends too as it is a main artery. I picked the lower part of the average and used 17,000 cars per day.

In splitting the difference in Nenshi’s numbers, we get an average of 2.25 minutes of driving time per driver due to the tracks which adds up to 637.5 extra automotive hours per day on that road.

When those extra hours are applied over the course of a year, we have 232,687.5 extra hours per year that cars are running on 12 Ave SW due to the empty cycle tracks.

So much for proponent claims that these tracks would reduce traffic.

The cost of so many wasted hours cant be understated.

What kind of environmental impact is caused by an extra 232,687.5 hours of active vehicular traffic?

What does this add up to for consumers as extra fuel is purchased and extra wear and tear is imposed on vehicles due to this slow, start and stop traffic?

How about productivity? I bet if those 1/4 million hours were applied to work rather than sitting in traffic, we would see some benefits.

How about quality of life? 232,687.5 unnecessary hours are being wasted sitting in cars. What if that time was spent with family? Perhaps in the gym? Maybe simply sleeping or getting a better breakfast. Pretty much anything is better than sitting in traffic without cause.

These numbers are from just one avenue in Calgary. The cycle tracks are on many other streets and are impacting traffic there too. What kind of extra commute time numbers are we talking when all of the cycle tracks are added up? Possibly into the millions of hours.

Millions of hours of time wasted with fuel burned by Calgarians so that a handful of hipsters can use cycle tracks downtown during good weather. Is this a good trade?

Calgary has one of the best cycle path systems in North America but you wouldn’t know it to listen to the few but shrill downtown cycle lobbyists.

City council needs to look at the real and cumulative impact of these tracks downtown. They are a failure and should be removed if the interests of the majority of Calgarians are to be taken into consideration.

Of course, if the interest is an anti-auto agenda rather than that of the majority of Calgarians, we can expect these tracks to stay no matter how terrible the numbers are.

Sad when the damage and cost is considered.

 

Let’s put the proposed Macleod Tr. bike track to the test.

Nobody should fear a test unless they have reason to believe that they will fail it.

To say that taking a lane from Macleod Tr. Southbound (1 St. SE) in Calgary’s downtown in order to give the space to a tiny minority of bicycle commuters is a radical plan would be a gross understatement.

Calgary transportation planning appears to be actually trying to go ahead and take away 25% of the lane space from a piece of roadway that services 25,000 vehicles per day. This initiative appears to be based on some very weak speculation and projections of how much further Calgary’s traffic will be congested or how many new cyclists such a plan could draw. It doesn’t take a deep study to know that the claim by the transportation department that such a move would only increase people’s commute time by one minute to know that such a statement is nothing less than utter hogwash.

Calgary taxpayers paid tens of millions of dollars to build the roadways that will be covered by this rather aggressive cycle track network plan. It is not too much to ask to see some simple testing conducted to assure us that the impact upon downtown traffic will be reasonable and that these invisible thousands of potential cyclists will indeed pop out of the woodwork?

We should put the Macleod Tr. bike track to the test by temporarily setting the track up and getting true, hard figures on how well this may or may not work. Again, when we are talking about 10s of millions of dollars in infrastructure at risk here, the cost of such a test is negligible. No more cute artist’s depictions of how the new street would look. No more projected numbers on how many people would give up their cars in favor of a bicycle. Let’s lay down the barriers and see how it goes.

The required barriers are cheap and doubtless the city keeps them in stock for construction projects.

barrierThere are plastic barriers that are very cheap and easy to install as well.

plasticbarr

For intersections, temporary lights have been used on construction projects for decades. We are in the days where a $50 cell phone can store and play an entire feature film. Programing temporary traffic signals is pretty easy.

stoplightWe will need a little painting done. We know that we have spare city staff as they used 10 of them to paint the simple little green box below and now are all fully qualified in road painting.

bikeWith one weekend of construction we could take the lane from Macleod Tr. South and give it to those masses of awaiting cyclists. Let’s say we do this in May so the proponents can’t use the weather excuse and let’s say we leave the barriers up for a full 30 days.

With such a simple and reasonable test we can find out definitively just how traffic will be impacted by this proposed bike track. We will also find out how many new cycle commuters will be drawn to the new track. Most importantly, we will give commuters and businesses downtown a good taste of what the cycle plan has in mind for them as they target all of Calgary’s busiest central roadways for more cycle tracks.

The cycle proponents should be thrilled with such a concept. They are confident that most Calgarians want to give up main roadways for cycle tracks. They are confident that thousands of auto commuters are just waiting to cycle to work every day but have not done so due to the lack of a track. This experiment should prove the cycle advocates correct right?

Imagine how easy it will be to sell future bike tracks once Calgarians see that traffic is not impacted and that the bike lane looks like a scene from a Norman Rockwell painting with commuters on bicycles mingling with happy families all riding together with beatific smiles on their faces as they enjoy these vibrant, sustainable lanes!

rockwell-bicycle-sm-237x300

Doing tests and pilot projects for major changes to roads is actually standard practice in many Calgary transportation initiatives despite their not doing this with the bike track plans.  When I was living in the Northwest a couple years ago, temporary barriers were installed along 4 st NW as a pilot project for traffic calming. The barriers were changed and moved a couple times after real impacts were measured and citizen input was taken into account (people in the neighborhood were not pleased).

On Macleod Tr. South, a pilot project was undertaken to change morning congestion around Avenida as things had been bottlenecking. As can be seen with this detailed report, the pilot project led to a significant saving in commuter time and was made permanent. Had the project not aided traffic flow, it simply would have been scrapped. This is simple good planning. There is no reason why such pilots and tests can’t be applied to cycle tracks.

Edmonton Trail and Memorial have both seen major pilot projects on traffic flow and doubtless every major road in the city has seen some testing at one time or another.

Let’s put this whole debate to rest and put the case for cycle tracks at the expense of major road arteries to rest once and for all!

I suspect that the cycle track proponents will adamantly oppose the concept of such a test for the reason stated in the very first sentence of this posting.